Error message: "The cost centre and/or project is required."

This error message in Bookkeeping Gemak & Multivers indicates that it is mandatory to select a cost centre and/or project for the selected general ledger account.

Short Answer

Check the settings of the relevant general ledger account to determine whether Cost Centre and/or Project has been configured as a required classification.

When Do You Use This?

Use this article when you receive the following error message in Bookkeeping Gemak & Multivers:

"The cost centre and/or project is required."

This message appears when a cost centre and/or project must be entered for the selected general ledger account.

Step-by-Step Instructions

Check the General Ledger Account Settings

  1. Go to Maintenance > Chart of Accounts.

  2. Enter the relevant general ledger account (code xxxx).

  3. Open the General tab.

  4. Select the Classification tab.

  5. Check whether Cost Centre and/or Project is configured for the account.